Deck, Fence & Shed Tear-Out Dumpster Rental in Roseville, Rocklin & Lincoln

Written by

in

Fall is when a lot of backyard projects finally get done: the tired deck, the leaning fence, the shed nobody has opened in years. Whether you’re doing the tear-out yourself or have a contractor lined up, a deck removal dumpster on the driveway keeps old lumber off the lawn until the job is done. Below, Placer Dumpster Rental And Junk Removal LLC, based in Rocklin and serving Roseville, Rocklin and Lincoln homeowners, walks through box size, weight, loading rules, post footings, driveway placement and scheduling. Questions on a specific yard? Phone or text (916) 878-0304.

Why outdoor tear-outs are showing up now

In Lincoln, twenty-year-old fencing and decking across the newer subdivisions is reaching replacement age. In Rocklin, many homes in Stanford Ranch, developed beginning in the 1980s, are due for fence and deck rebuilds. Out in Loomis, clearing old fencing, lumber and general property debris is the most common job we see, and around Granite Bay, brush plus an old fence is a typical 12 yard defensible-space job. The debris is the same everywhere: boards, framing, posts and sometimes a little concrete.

Which size fits a deck, fence or shed tear-out?

Start with the project:

Your project Where we’d start Why
Clearing out a shed, a shed roof, a short fence run, or a small yard cleanup 10 yard About four pickup truck loads, with the same 1 ton as the larger sizes
Deck removal or a longer fence tear-down 12 yard The size we book for deck removal or a longer fence run, about five pickup truck loads
Tearing down a shed or other outbuilding, or six-plus pickup loads of debris 15 yard About six pickup truck loads; it sits on the 12 yard’s footprint but stands a foot higher

A simple rule of thumb: count how many pickup truck loads you would haul yourself, then round up. Three to four loads, go 10 yard. Five loads, go 12 yard. Six or more, go 15 yard. If you’re between sizes, the larger one usually costs less than a second delivery. Our dumpster size guide walks through more examples.

Weight: where the 1 ton goes

Each standard box comes with delivery, pickup and exactly 1 ton included. Going bigger adds space, never extra weight allowance. On an outdoor tear-out, weight usually sneaks in from three places:

  • Shed roofing. Shingles are heavy for their volume, so a box can reach the ton before it looks full.
  • Wet material. Like shingles, it reaches the ton well before the box looks full.
  • Dirt stuck to posts and roots. Dirt, sod and rock are never allowed in a standard dumpster, so knock off what you can before loading.

Overweight isn’t a crisis: anything past the ton is billed at $110 per ton, prorated. And if the box fills mid-project, we can swap it for an empty one. That extra load runs $399 (10 yard), $449 (12 yard) or $499 (15 yard), and each one carries a fresh 1 ton allowance.

What can go in, and what can’t

Most of what comes off a deck, fence or shed can go in the same dumpster with no sorting: wood and framing lumber, old fence boards, plywood, roofing, and yard debris such as branches, brush and shrub trimmings. Household junk from the shed can go in the same rental. Lay big flat pieces like plywood on the floor first, spread heavy debris across the bottom, and keep the load inside the box.

A few things have to go elsewhere:

  • Railroad ties and telephone poles. These are not allowed in our dumpsters, and our junk removal crew can’t take them either.
  • Whatever was stored in the shed. Paint, solvents, gasoline, chemicals, batteries and tires stay out. Empty gas cans and propane cylinders and dispose of them separately. Our paint, battery and chemical disposal guide lists local drop-off options.
  • Old fridges or freezers. Appliances that still hold Freon can’t go in.
  • Dirt, sod, rock and concrete. See the next section.

Our guide to allowed and banned dumpster items has the complete list. Clearing brush too? See our yard waste dumpster page.

Footings, post holes and shed slabs

Concrete, asphalt, dirt, brick and other masonry never go in the 10, 12 or 15 yard. Those belong in the dedicated Concrete & Dirt dumpster: a single clean material in each load, up to 5 cubic yards, with no dump fees. It’s $399 the first day and never more than $649. Rebar inside concrete is accepted if it sticks out no more than 6 inches. As a rough guide, 5 cubic yards is about 400 square feet of 4 inch thick slab.

The tricky part on a fence or deck is the posts. A wood post still set in a concrete footing is concrete mixed with lumber, which doesn’t fit either dumpster as-is. Separate the two, or text us a photo and we’ll help you split the job.

What it costs

One-day rates are $399 (10 yard), $449 (12 yard) and $499 (15 yard), delivery, pickup and the first ton included. Add $50 per extra day up to day 5; days 6 and 7 are free, which caps a full week at $599, $649 or $699. Need more than a week? Call us for a quote. Every rate is listed on our price page.

Timing your tear-out

You pick a Delivery Date and a Pickup Date when you book, and the days in between are your rental, so Monday to Wednesday is 2 rental days. You can book as many as 7 rental days online. We deliver in the morning, typically 7 to 10 AM, so loading can begin right away. With the last two days of the week free, booking all 7 is an easy way to cover a weekend project that spills into the next weekend. Contractors can set up repeat service through our contractor dumpster page.

Driveway placement and HOAs

We set the dumpster on your driveway, so plan for a box roughly 7 feet wide by 10 to 12 feet long. When you book, text a photo of the driveway to (916) 878-0304 and tell us about anything to keep clear, such as a low branch, a gate you need for wheelbarrow access to the backyard or a neighbor’s mailbox. Our dumpsters are delivered on a rubber-wheel system to help protect your driveway. If you’re in an HOA, check your CC&Rs or management company for how long a dumpster can stay and tell us your allowed dates.

Would junk removal be easier?

If the tear-out is already done and you’re left with a loose pile of old boards, branches or the junk that was in the shed, junk removal may be simpler. Our crew does the lifting, and the price is based on trailer space: $150 minimum, roughly $500 for a half trailer and roughly $900 for the full 15-yard trailer. When the work stretches over several days, renting a box tends to make more sense.

City-specific notes: dumpsters in Roseville, in Rocklin and in Lincoln. In the foothills, see dumpster rental in Granite Bay and in Loomis. For a pile our crew loads, see junk removal in Roseville or in Granite Bay.

Ready to plan your tear-out? Call or text a photo of the project to (916) 878-0304 and we’ll match the box to the job. Based in Rocklin, CA 95765.

Deck, fence and shed tear-out dumpster FAQ

Which dumpster size works for a deck removal?

For most decks we book a 12 yard. If more is coming out in the same rental, count pickup truck loads and round up: six or more is a 15 yard.

Can old fence boards and deck lumber go in the dumpster?

Yes. Wood, old fence boards, plywood and framing go in our 10, 12 and 15 yard dumpsters, mixed with other debris and no sorting needed. Railroad ties and telephone poles are not allowed.

Can fence posts set in concrete go in the dumpster?

Not as-is. Concrete has to ride in the Concrete & Dirt dumpster by itself, and no wood can be mixed into that load. Separate the wood from the concrete, or text us a photo and we’ll help you split the load.

Which size fits a shed tear-down?

Shed and outbuilding demolition is on our list of 15 yard projects. A concrete slab under the shed goes in a separate Concrete & Dirt load.

How many days should I rent for a fence or deck project?

Enough to finish the tear-out and the cleanup. The sixth and seventh days are free, so a full week tops out at $599, $649 or $699 depending on size.

Can I load the dumpster from the backyard with a wheelbarrow?

Yes. Most fence and deck tear-outs are loaded by wheelbarrow or by hand from the backyard. Lay long boards flat, break up big sections so they fit inside the box, and keep the load below the top edge so it can be hauled safely.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *